Jul
24
Enercon GmbH, a maker of wind-power
parts, abandoned a 23.1 million euro ($28 million) plan to build
a turbine plant in Galicia, Spain, Windpower Monthly reported.
The decision followed the country’s suspension of feed-in
tariffs for renewable energy, the report said, citing Juan Ruiz-
Jarabo, head of the company’s Spanish division.
To contact the reporter on this story:
Josephine Forster in London at
jforster13@bloomberg.net
To contact the editor responsible for this story:
Reed Landberg at
landberg@bloomberg.net
Open all references in tabs: [1 – 6]
Comments
Leave a Reply
You must be logged in to post a comment.